Minnesota Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Net Metering
Solar Export Type
Percentage of Retail Rate
Solar Export Percent
100
Net Excess Generation Notes

Kilowatt-hours produced by the QF in excess of the monthly usage shall be supplied as an energy credit on the member’s energy bill, carried forward and applied to subsequent energy bills, with an annual true-up on December 31. Excess energy credits existing as of December 31 shall default back to the Cooperative with no compensation to the QF


Customer have the option to select an Export Rate

Rebates Offered
0
Deregulated
0
Allows Standby
0

Interconnection & taps

Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A

Plans & docs

Website
link
Phone
(320) 328-5318

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
14245655
Express Planset Eligible
Yes