Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Solar Export Type
Avoided Cost
Net Excess Generation Notes

Like most utilities in Minnesota, the customer will have the option to select what their post solar billing is going to be. (NEM Monthly/Annual or Export Rate). They'll select this when the utility sends them the Uniform Contract (or Interconnection Agreement).


NEM Annual: excess kWh (in kWh) will rollover to the next month. At the end of the year (12/31) excess kWh will expire

NEM Monthly - excess kWh will be credited monetarily at the end of the billing period at average retail cost

Export Rate: $0.04 - $0.06 (depending on the season)

Rebates Offered
0
Deregulated
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
1

System size & offset

System Size Restrictions
40
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Utility Specific Adjustments


Inverter Oversize Restrictions
0
System Offset Notes


Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Utility Disconnect Switch

Plans & docs

Electrical Stamp Required
0
Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
1
ESID Num Req SLD 3LD
0
Website
link
Phone
(763) 682-1181

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
9939163
Express Planset Eligible
Yes