Net Metering AllowedYes
NEM TypeAnnual
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
Yes
NEM Type
Annual
TOU Utility
No
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

Roll-over credit: excess kWh will roll-over to the next billing period until the end if the annual period (March 31). After the annual period, if there are any remaining kWh, they will not be compensated and will be zeroed out. Average Retail Rate: utility will purchase excess kWh at the end of each monthly billing period. Credit (monetary value) can be used on the next billing period or the utility can send a check to the customer.

Rebates Offered
No
Deregulated
No
Allows Standby
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No

System size & offset

System Size Battery Included
No
System Size Includes Existing Systems
No

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A

Plans & docs

Placards


Website
link

Other details

Revision Required
Yes
Mod Swap Requires Planset
Yes