Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

MiEnergy

Minnesota Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Net Metering
Solar Export Type
N/A
Net Excess Generation Notes

Rollover kWh credits: All excess banked kWh from a member’s DER generation will be trued up at the end of March each year and up to 2,000 kWh of excess DER generation can be rolled over each year

Rebates Offered
0
Deregulated
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
40
System Size Restriction Type
AC kW
System Size Battery Included
1
System Size Includes Existing Systems
1
Offset Type
Combination
Offset Value
105
Offset Calculation Basis
Historical
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Inverter Oversize Restrictions
0

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-Disco-PM-POI
Production Meter Labeling
Production Meter
AC Disconnect Required
Yes
AC Disconnect Labeling
Utility Disconnect Switch
Allowed Meter Adapter
None

Plans & docs

Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Website
link
Phone
(507) 864-9253

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
13996241
Express Planset Eligible
No
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with MiEnergy before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.