Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

The customer may choose their preferred post-solar billing option. A. 'Average retail utility energy rate' (NEM Monthly), B. 'Simultaneous purchase and sale billing rate' (Export), or C. 'Roll-over credits' (NEM Annual). The customer may also choose whether they would like the excess credit applied to their bill or paid out by check for options A and B.

Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
1

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

The 120% offset rule does not apply to systems under 40 kWac if the customer is not applying for the rebate.

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-Disco-PM-POI
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect

Plans & docs

Site Plan Reqs

Standard

SLD Reqs

Relay Meter Orientation = Under/Over


  1. Production Meter: Yes
  2. AC disconnect label: Generator Disconnect Switch
  3. AC disco to PM to POI
  4. Utility meter label: General Service Meter
  5. PM bottom to top of utility meter.

EXAMPLE PROJECT ----> EXAMPLE

Electric Service Reqs

IEEE 1547

UL 1741

NFPA 70

ANSI C84.1

Install Reqs

AC Disconnect required

Electrical Stamp Required
0
Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Electrical Diagram Notes


Website
link
Phone
(952) 758-4401

Other details

Address ID
8668925
Express Planset Eligible
No