Owatonna Public Utilities

Minnesota Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
NEM TypeMonthly
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
Yes
NEM Type
Monthly
TOU Utility
No
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

Net metering is done on the billing cycle. The average retail rate that we pay during a bill that a customer net-exports, for 2024, is $0.12487/kWh

Rebates Offered
Yes
Deregulated
No
Allows Standby
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
No

System size & offset

System Size Restrictions
40
System Size Restriction Type
AC kW
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Systems below 40 kW AC doesn't have any offset requirement.


If the system is over 40 kW AC, then it must be sized to not go over 120% offset of their historical usage.

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-Disco-PM-POI
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect

Plans & docs

Site Plan Reqs

AC disconnect verbiage: "24/7, unescorted and readily accessible"

SLD Reqs

Wiring of the production meter must be shown: (wires from solar to line side of production meter - load side to POI)


AC disconnect verbiage: "24/7, unescorted and readily accessible"

Install Reqs

Production Meter must have a lever bypass


Utility Meter must have a lever bypass, if it doesn't it'll be the customer/contractor's responsibility to upgrade the meter socket.

Placards

If installing multiple AC disconnect, install placard with (1 of x, 2 of x and etc).

For variance request - must install Site Map placard

Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
Yes
ESID Num Req SLD 3LD
No
Website
link
Phone
(507) 451-2480

Other details

Revision Required
Yes
Mod Swap Requires Planset
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Owatonna Public Utilities before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.