Shakopee Public Utilities

Minnesota Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

When the energy generated by the qualifying facility exceeds that supplied by the Cooperative during a billing period, the Cooperative shall apply the excess kilowatt hours as a credit to the next billing period kilowatt hour usage. Excess kilowatt hours that are not offset in the next billing period shall continue to be rolled over to the next consecutive billing period. Any excess kilowatt hours rolled over that are remaining at the end of each calendar year shall cancel with no additional compensation.


** Net metered customers have the option to receive a refund check mailed to them with any monthly credit billing. This credit can also remain on the customer’s account offsetting the next billing period charges. This preference is selected at the time of interconnection installation.

Rebates Offered
1
Deregulated
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
40
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

For non-rebate projects: 40 kW AC with no offset requirement


Solar Rebate Requirements:

  • Total system size does not meet a minimum of 2kW
  • Systems annual energy production does not exceed 120% of prior annual usage
Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-Disco-PM-POI
AC Disconnect Required
Yes
AC Disconnect Labeling
Utility Disconnect Switch

Plans & docs

SLD Reqs

Standard



Rebate Requirements:

  • SPU reserves the right to prorate the available rebate when a system -
  • is shaded permanently by nearby trees, or
  • is not 100% oriented at an azimuth between 120º and 240º
Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Rate Schedule Link
link
Website
link
Phone
(952) 345-2476

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
8733341
Express Planset Eligible
No
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Shakopee Public Utilities before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.