Virginia Public Utilities (City of Virginia)

Minnesota Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
NEM TypeAnnual
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
Yes
NEM Type
Annual
TOU Utility
No
Post Solar Billing Method
Net Metering
Solar Export Type
Other
Solar Export Value Notes
If export rate: solar export value will be the same as retail price
Net Excess Generation Notes

Depends on what the customer will select, per utility the most common one is the average retail rate utility energy rate. This method is when the utility will purchase the excess energy at average retail rate. Monetary credit will rollover to next month's bill or the utility will send a check to the customer.

Rebates Offered
No
Deregulated
No
Allows Standby
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No

System size & offset

System Size Battery Included
No
System Size Includes Existing Systems
No

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A

Plans & docs

Website
link
Phone
(218) 748-7540

Other details

Revision Required
Yes
Mod Swap Requires Planset
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Virginia Public Utilities (City of Virginia) before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.