Evergy Missouri West
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
If the electricity generated by the Customer-Generator exceeds the electricity supplied by the Company during a billing period, the Customer-Generator shall be billed for the appropriate Customer charges for that billing period in accordance with the Company Obligations section of this tariff and shall be credited with the product of the excess kilowatt-hours generated during the billing period and the rate identified in Schedule PG, Sheet 31A in the following billing period. This rate is calculated from the Company’s avoided fuel cost;
- Rebates Offered
- 0
- Deregulated
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 100
- System Size Restriction Type
- DC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Existing Homes
Last 12 months of usage (in kWh) / 8760 (hours in a year) / 0.144 (Evergy’s capacity factor - 14.4%)
Example
- Customer’s usage = 8500 kWh over the last 12 months  Calculation = 8500 / 8760 / 0.144  Maximum system size = 6.72 kW
For customers less than 12 months usage:
Load Worksheet is available on KCPL.com
** Future loads:
"We are unable to consider potential future load, such as a pool addition or a new electric vehicle, when calculating the maximum system size."
New Construction
There is one exception to the maximum system size calculation, new construction. If an account was recently constructed and does not have 12 months of usage data, then we utilize the square footage of conditioned space for the building to estimate the annual usage
Formula
Sq. Footage x 7.15
Example
- Building has 1500 sq. ft of conditioned space
- Calculation 1 = 1500 x 7.15
- Estimate usage = 10,725 o Calculation 2 = 10,725 /8760 / 0.144
- Maximum system size = 8.50 kW
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Utility Disconnect Switch
- Meter Adapter Requirements
"As of today, Evergy has update their DER standards to allow three different meter
collar adapters. Evergy is approving these 3 meter collar connections only.
--GenerLink
--Tesla Backup Switch
--ConnectDER
Evergy personnel, along with the electrician, will need to be onsite together when the
meter adapter is installed. Until our installer portal is updated to collect information on
meter collars (expected in January 2025), please notify us in the portal when a post _x0002_inspection is requested for a meter collar installation"
- Allowed Meter Adapter
- ConnectDER,Tesla Backup Switch
Plans & docs
- Site Plan Reqs
Standard
- legible map of the location and meter location shall be included
- SLD Reqs
Standard
- Electric Service Reqs
IEEE 1547, UL 1703 and UL 1741
- Install Reqs
AC Disconnect required
- Electrical Stamp Required
- 0
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
- Phone
- (816) 242-5971
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 8597512
- Express Planset Eligible
- Yes