Missoula Electric Coop
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
2.2.1 MEC will not purchase energy produced by the Member;
2.2.2 Name-plate generating capacity generally may not exceed 10 kW;
2.2.3 All member request for net metering beyond the 10kW limit will be
reviewed by MEC’s Manager of Engineering and presented to MEC’s
Board of Trustees for consideration. In no case will the allowable nameplate generating capacity rating exceed 50 kW.
2.2.7 Charges for energy delivered by MEC in excess of the energy flowed back onto the system shall be billed monthly at a retail rate. Excess kWh’s may be banked beyond the monthly billing period. (banking is a method of
accounting, within an annual billing period, for energy produced for export
into the distribution system for later use at that customer’s service);
2.2.8 MEC may annually true-up (zero) banked kWh’s. The true-up will occur following the April billing cycle.
- Rebates Offered
- 0
- Deregulated
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 1
- Line Taps Allowed
- 1
- Load Taps Allowed
- 1
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Inverter Oversize Restrictions
- 0
- System Offset Notes
- Nameplate generating capacity shall not exceed 10 kW.
- Offset Calc Tool
- PV Watts
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- The components of the system up to the meter/service point.
- SLD Reqs
- One-Line diagram showing the configuration of all Small Generating Facility equipment, current and potential circuits, and production and control schemes.
- Install Reqs
- No PM, but please be aware our meter will only read the energy being transferred onto our system. Most people are using power as they generate so what they will see on their bill won’t necessarily reflect what they are producing.
- Placards
- Required by NEC
- Equipment Approvals
- California Energy Commission
- Website
- link
- Phone
- (406) 541-4433
Other details
- Restrict Inspection
- 0
- Address ID
- 271484
- Express Planset Eligible
- Yes