City of Albemarle

North Carolina Utility Interconnection & net metering rules
Net Metering Allowed0
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
0
Post Solar Billing Method
Feed-in-Tariff
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.0287
Net Excess Generation Notes

Albemarle does offer individual residential solar. As of right now, the utility offers the buy-all sell-all application. All solar generation is sold back to the grid and credited at the avoided cost rate, currently .0287c/kWh. 

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
20
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-Disco-PM-POI
AC Disconnect Required
Yes

Plans & docs

SLD Reqs
  • Production meter required. Feed-in-tariff. Example line diagram in the database files section.
Website
link
Phone
(704) 984-9615

Other details

Restrict Inspection
0
Revision Required
0
Mod Swap Requires Planset
1
Address ID
1828780
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with City of Albemarle before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.