City of Rocky Mount (NC)
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedNo
NEM TypeN/A
Line Taps AllowedNo
Load Taps AllowedNo
Net metering & export
- Net Metering Allowed
- No
- NEM Type
- N/A
- TOU Utility
- No
- Post Solar Billing Method
- Feed-in-Tariff
- Solar Export Type
- Fixed kWh
- Solar Export Rate
- 0.0324
- Net Excess Generation Notes
The process by which the City purchases energy generated is through a bilaterial metering process. The customer will have a meter supplied by the city that measures the energy the customer receives from the electric utility provider as well as a second meter that measures the output from the generating device. A credit for each kilowatt hour produced will be applied to the customer's monthly utility bill.
- Rebates Offered
- No
- Deregulated
- No
- Allows Standby
- No
Interconnection & taps
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- AC kW
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
Other details
- Revision Required
- Yes
- Mod Swap Requires Planset
- Yes