Edgecombe-Martin County EMC
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedYes
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- Yes
- TOU Utility
- No
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.0398
- Solar Export Value Notes
- Credit billings to the member shall be payable to the member within twenty-five (25) days of the date of the scheduled meter reading. Credit on account for reverse energy is $0.0398/kWh
- Rebates Offered
- No
- Deregulated
- Yes
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- No
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- Percentage
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Standard
- SLD Reqs
Standard
- Electric Service Reqs
AC Disconnect Required:
- Customer shall install a manual load-break disconnect switch with a clear visible indication of switch position between Cooperative's electric system and Interconnection Customer's Generator
- Install Reqs
Member shall install a manual load-break disconnect switch with a clear visible indication of switch position between Company's electric system and Member's Generator. The Isolation Device shall be installed as specified in the Interconnection Standard.
- Placards
- Member will install a permanent warning label in a conspicuous place in close proximity to the electric meter or on the meter base to notify Company personnel that there is a generator installed on the load side of the meter.
- The warning label shall not be placed in a location that would interfere with the ability of Company personnel to read the electric meter.
- Member shall also place a warning label on the Isolation Device. Company will provide the warning labels to Member. The warning labels must be in place before the Generator can be interconnected with Company's system.
- Electrical Stamp Required
- No
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- No
- ESID Num Req SLD 3LD
- No
- Website
- link
- Phone
- (800) 445-6486