High Point Electric Company

North Carolina Utility Interconnection & net metering rules
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Post Solar Billing Method
Feed-in-Tariff
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.0287
Solar Export Value Notes
Email from utility: The City of High Point uses a Buy All, Sell All metering set up. The City will install a second meter to measure the power created by the system; and all of the power is
Net Excess Generation Notes

The total system size for Residential is limited to 10 kWdc.

We have a Buy All / Sell All program that currently pays $0.0287 per Kilowatt-hour produced by the Solar Panels that will appear as a credit on the bill.

Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Max system size of 10 kW DC

Plans & docs

SLD Reqs
  • See Buy All Meter Configuration in the files
  • PV Meter required: Top Lugs to PV system, bottom lugs to Utility
  • Disconnect needs to be fused, regardless of POI
Website
link

Other details

Restrict Inspection
0
Address ID
4788628
Express Planset Eligible
Yes