Report a correction Net Metering AllowedYes
NEM TypeMonthly
Line Taps AllowedNo
Load Taps AllowedNo
Net metering & export
- Net Metering Allowed
- Yes
- NEM Type
- Monthly
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- Other
- Solar Export Rate
- 0.05
- Solar Export Value Notes
- $0.05/kWh
- Net Excess Generation Notes
Whatever the excess energy is sent back to us, we pay them $0.05/kWh
- Rebates Offered
- No
- Deregulated
- No
- Allows Standby
- No
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 20
- System Size Restriction Type
- AC kW
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- PV Watts
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
Drawing showing the meter to the system and where the AC Disconnect is located.
- Install Reqs
Customer shall install a manual load-break disconnect switch with a clear visible indication of switch position between JOEMC’s electric system and Customer’s DR. The Isolation Device shall be installed as specified in the Interconnection Standard.
- Equipment Approvals
- California Energy Commission
- Website
- link
- Phone
- (910) 353-1940
Other details
- Revision Required
- Yes
- Mod Swap Requires Planset
- Yes