Lumbee River EMC

North Carolina Utility Interconnection & net metering rules
Net Metering Allowed0
Line Taps Allowed1
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
0
TOU Utility
0
Post Solar Billing Method
Export Rate
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.03
Solar Export Value Notes
As of 11/2022
Net Excess Generation Notes

Lumbee River EMC agrees to credit the generator member-owner's account for all power generated and delivered through the Cooperative's system metering point at avoided cost.

Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
1
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
25
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-Disco-PM-POI
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs


SLD Reqs

Relay Meter Orientation = Over/Under


  • PV production meter required between the AC disconnect switch and the existing utility meter.
  • Top of PV meter wired toward inverter, Bottom toward utility.
  • Wires from the bottom of the Production meter must connect to the source side (Top side) of the Utility meter with a Lugged Connection. See Projects 368482, 350568, 371600 for example. The only method of interconnection allowed is Line Side Tap inside Meter Can.

Existing System

  • Only one PV meter required
Install Reqs
  • Interconnection Customer shall install a manual load-break disconnect switch with a clear visible indication of switch position between Cooperative's electric system and Interconnection Customer's Generator
Placards
  • Interconnection Customer will install a permanent warning label in a conspicuous place in close proximity to the electric meter or on the meter base to notify them personnel that there is a generator installed on the load side of the meter. The warning label shall not be placed in a location that would interfere with the ability of Cooperative personnel to read the electric meter. Interconnection Customer shall also place a warning label on the Isolation Device. The warning labels must be in place before the Generator can be interconnected with Cooperative's System.
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Electrical Diagram Notes


Website
link
Phone
(910) 843-4131

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
177166
Express Planset Eligible
Yes