Town of Clayton NC
Net metering & export
- Net Metering Allowed
- 0
- TOU Utility
- 1
- Post Solar Billing Method
- Feed-in-Tariff
- Solar Export Type
- Fixed kWh
- Solar Export Rate
- 0.0515
- Net Excess Generation Notes
Generating Facility No Larger Than 10 kW AC (inverter)
For non-TOU customers the amount of credit for all energy delivered to the Town will be $0.0515 per kWhr. In no case shall the energy delivered to the Town be less than zero.
Customer’s service shall be metered with two meters, one of which measures the energy provided by the Town and the other measures the amount of energy generated by the Customer’s renewable energy generator.
If the meter on the renewable energy interconnection output indicates a net consumption by the renewable energy source during any period, that energy consumption will be billed at the rate for the customer’s normal consumption under the Town’s RES, SGS, MGS, or LGS rates as applicable. Discovery of customer loads connected between the meter and the renewable energy source will result in disconnection of the system.
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- No
- Interconnection Level
- 1
- Line Taps Allowed
- 1
- Load Taps Allowed
- 0
- Tap Criteria
Only allowable POI is line side tap in NEW trough tap box.
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Up to 10kW AC (inverter)
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-Disco-PM-POI
- AC Disconnect Required
- Yes
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
10 kW AC cap
- SLD Reqs
See SLD Sample - 10 kW AC cap
- Electric Service Reqs
10 kW AC cap
- Install Reqs
We do require a 2-meter bilateral metering setup for solar panels.
Lineside tap in a separate tap box is the only allowed POI.
- Placards
Label : SOLAR PANEL ISOLATION SWITCH
- Electrical Diagram Notes
Only allowable POI is line side tap in NEW trough tap box.
New consumption meter and new bi-directional meter to be installed below utility meter, and tap will occur in trough where the consumption and bi-directional meter meet. See the attached "Sample Electrical Diagram" below in attachments for reference
- Website
- link
- Phone
- (919) 553-1530
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 719654
- Express Planset Eligible