Town of Clayton NC

North Carolina Utility Interconnection & net metering rules
Net Metering Allowed0
Line Taps Allowed1
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
0
TOU Utility
1
Post Solar Billing Method
Feed-in-Tariff
Solar Export Type
Fixed kWh
Solar Export Rate
0.0515
Net Excess Generation Notes

Generating Facility No Larger Than 10 kW AC (inverter)

For non-TOU customers the amount of credit for all energy delivered to the Town will be $0.0515 per kWhr. In no case shall the energy delivered to the Town be less than zero.

Customer’s service shall be metered with two meters, one of which measures the energy provided by the Town and the other measures the amount of energy generated by the Customer’s renewable energy generator.


If the meter on the renewable energy interconnection output indicates a net consumption by the renewable energy source during any period, that energy consumption will be billed at the rate for the customer’s normal consumption under the Town’s RES, SGS, MGS, or LGS rates as applicable. Discovery of customer loads connected between the meter and the renewable energy source will result in disconnection of the system.

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
No
Interconnection Level
1
Line Taps Allowed
1
Load Taps Allowed
0
Tap Criteria

Only allowable POI is line side tap in NEW trough tap box.

Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Up to 10kW AC (inverter)

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-Disco-PM-POI
AC Disconnect Required
Yes
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

10 kW AC cap

SLD Reqs

See SLD Sample - 10 kW AC cap

Electric Service Reqs

10 kW AC cap

Install Reqs

 We do require a 2-meter bilateral metering setup for solar panels.

Lineside tap in a separate tap box is the only allowed POI.

Placards

Label : SOLAR PANEL ISOLATION SWITCH

Electrical Diagram Notes

Only allowable POI is line side tap in NEW trough tap box.

New consumption meter and new bi-directional meter to be installed below utility meter, and tap will occur in trough where the consumption and bi-directional meter meet. See the attached "Sample Electrical Diagram" below in attachments for reference

Website
link
Phone
(919) 553-1530

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
719654
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Town of Clayton NC before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.