Union Power Cooperative
Net metering & export
- Net Metering Allowed
- 0
- Post Solar Billing Method
- Feed-in-Tariff
- Solar Export Type
- Fixed kWh
- Solar Export Rate
- 0.0425
- Net Excess Generation Notes
"Small Generation 25 kW or less
Service hereunder shall be restricted to the capacity of the member’s generating facilities which may be operated in parallel with the Cooperative’s system. Service necessary to supply the member’s Auxiliary Load when the member’s generating facilities are not operating, shall be billed at the Cooperative’s applicable rate schedule and increased or decreased in accordance with the Wholesale Power Cost Adjustment Rider. Power delivered to the Cooperative under this Rider shall not offset or be substituted for power contracted for or which may be contracted for under any other schedule of the Cooperative.
Will Union Power require a separate meter?
Maybe. Depending on the nature, size, and configuration of the existing facility and the renewable generator, a second meter may be required. Also, the intended use of the generator by the owner may dictate the metering configuration."
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 1
- Line Taps Allowed
- 1
- Load Taps Allowed
- 1
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 100
- System Size Restriction Type
- DC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
- Offset Calc Tool
- PV Watts
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Meter Spot Process
Transformer upgrades would be on a case by case basis. I haven’t experienced the need for that yet and I have been working with solar for the last 4 years. Before that I worked in Engineering with Union Power.
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
The one line should show the panels, inverters, disconnects and the lines back to the home panel and feed back to the utility meter. Size of solar system in KW must be shown in AC voltage.
- Install Reqs
A manual load-break disconnects switch or safety switch with a clear visible indication of switch position between the Area EPS and the Generator. The switch must have pad lock provisions for locking in the open position. The switch must be visible to, and accessible to Cooperative personnel. The switch must be in close proximity, and visible from, the Member’s point of electrical interconnection with the Cooperative’s Area EPS.
- Placards
The switch must be labeled “Generator Disconnect Switch”.
- Electrical Stamp Required
- 0
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
- Phone
- (704) 289-3145
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 177390
- Express Planset Eligible
- Yes