Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Wilson Energy

North Carolina Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

A credit for each kilowatt hour produced, in excess of what the customer uses, will be applied to the customer’s bill. Sell Excess residential REGS shall be limited to the lesser of the Customer’s maximum annual demand or 20 kW maximum ac output.

Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs
  • AC Disconnect must be adjacent to the utility meter
  • AC Disconnect must be accessible to the utility 24/7
Install Reqs
  • The service disconnect shall include provisions for locking in the open position.
  • The service disconnect shall be labeled in accordance with NEC 705.10.
  • All interconnected REGS shall be non-islanding.
Website
link
Phone
(252) 399-2424

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
1137638
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Wilson Energy before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.