Borough of Pemberton

New Jersey Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedNo
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
No
Post Solar Billing Method
Export Rate
Solar Export Type
Fixed kWh
Solar Export Rate
0.02959
Solar Export Value Notes
Rate Expires: December 31, 2023
Net Excess Generation Notes

During the term of this Agreement, the Borough of Pemberton shall buy from the Producer the electrical energy produced by the producer and delivered to the electrical distribution system of the Borough subject to the terms and conditions of this Agreement. 

Rebates Offered
Yes

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
AC kW
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
AC Disconnect Required
Yes
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

PE Stamped

SLD Reqs

PE Stamped

Electric Service Reqs

The interconnection point between the self-generator and the Pemberton Borough electrical distribution system shall be on the resident-customer's side of the designated metering location. It shall operate in synchronization with the Borough's system.


Electrical quality must be 60 Hz, alternating current having voltage and phase characteristics acceptable to the Pemberton Borough electrical distribution system. Operation of the self-generating unit shall not result in flicker, voltage fluctuations, interference with electronic equipment, or damage to the Borough's transmission system or residentcustomer owned equipment.


Equipment shall be capable of being manually and automatically isolated from the Pemberton Borough electrical distribution system within a maximum of 10 seconds, and provide for automatic disconnection from utility lines that have been de-energized.

Electrical Stamp Required
Yes
Website
link
Phone
(609) 894-8222

Other details

Mod Swap Requires Planset
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Borough of Pemberton before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.