CNMEC - Central New Mexico Electric Cooperative

New Mexico Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed1
Load Taps Allowed1
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.03
Net Excess Generation Notes

Excess generation is credited at CNMEC's avoided cost, which is filed in January of every year with the PRC.

Rebates Offered
0
Deregulated
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
1
Load Taps Allowed
1
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
DC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

"Interconnection customer also agrees to abide by the Terms and

Conditions for Interconnecting an Inverter-Based Generating Facility No Larger than 10 kW contained in

the New Mexico Interconnection Manual, Exhibit 3A"

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-Disco-PM-POI
Production Meter Labeling
Production Meter
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

Clearly show the location of all interconnection equipment, disconnect switches, meters and turbines/panels as well as structures and nearby roads/intersections, utility service pole(s) and utility transformer.


Can NOT hang equipment on mobile homes. Will require an H Frame.

SLD Reqs

A one-line electrical diagram of the facility and its interconnection to the utility system needs to clearly show the electrical components, protective devices, manufacturer model numbers and electrical ratings. Indicate the model number and ratings of turbines/panels, batteries, inverters, fuses, circuit breakers, disconnect switches and meter housings.


LOAD CALCS REQUIRED ON ALL PROJECTS


Existing Systems

Only one PV meter required, systems to be combined.

Install Reqs

Interconnection customer understands and agrees to abide by the requirements of NMPRC Rule 568 for interconnecting generators sized no larger than 10 kW and using a certified inverter at the point of interconnection with CNMEC. Interconnection customer also agrees to abide by the Terms and Conditions for Interconnecting an Inverter-Based Generating Facility No Larger than 10 kW contained in the New Mexico Interconnection Manual, Exhibit 3A.

Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Rate Schedule Link
link
Website
link
Phone
(800) 339-2521

Other details

Restrict Inspection
0
Address ID
147054
Express Planset Eligible
No
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with CNMEC - Central New Mexico Electric Cooperative before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.