Farmington Electric Utility
Net metering & export
- Net Metering Allowed
- 0
- Post Solar Billing Method
- Export Rate
- Net Excess Generation Notes
As of February 1, 2017, FEUS' net metering program is closed to new customers. Existing customers are grandfathered under the most recent net metering tariffs.
- Rebates Offered
- 0
- Deregulated
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 1
System size & offset
- System Size Restrictions
- 40
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Combination
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- System Offset Notes
You can go up to 40kW AC for residential customers. There will be a possibility of changing the size of the transformer and service/secondary wires that are connected directly to the customer. The customer will pay 100% of the estimated cost for the labor & materials based on your system connectivity evaluation study and safety purposes. Not all applications are approved on the basis of the customer's location with regards to the distribution line system is currently known to be arranged.
100% offset
Metering & disconnect
- Production Meter Required
- No
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
An electrical one-line diagram of the Generating Facility beginning at the interconnection point and the AC and DC schematics. Prior to being submitted to FEUS, all drawings/documents shall be approved by a Professional Electrical Engineer registered in the State of New Mexico. All drawings are to be prepared to professional drafting standards
- Electric Service Reqs
For MPUs: Fill out the Load Calc Form from files section.
- Install Reqs
We based our billing on the Net Meter that is installed by FEUS.
FEUS requires that a utility-accessible, lockable load-break disconnect switch be installed between the output of the inverter and the point of interconnection. This switch is referred to later as the customer generation disconnect switch. This disconnect, which can be operated and controlled by FEUS, must provide a verifiable, visible air gap between the inverter and the point of interconnection. Circuit breakers and inverter software modes do not meet the disconnect switch
requirement. Be sure to confirm with your installer that opening the customer generator.
- Placards
A permanent weatherproof one-line diagram or sketch of the system must be installed at the FEUS point of service.
- Electrical Stamp Required
- 1
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Electrical Diagram Notes
The wiring diagram must show the required branch circuit breakers for all loads (no lug fed panels).
- Rate Schedule Link
- link
- Website
- link
- Phone
- (505) 599-1353
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Address ID
- 702208
- Express Planset Eligible
- Yes