RCEC - Roosevelt County Electric Cooperative

New Mexico Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

Excess kWh will be purchased by the Coop at avoided cost that changes month to month. Winter months can range from $0.02 - $0.03 / kWh while during Summer can go all the way up to $0.05 / kWh. Excess kWh is defined as having a negative net kWh. At the end of the billing cycle, the total energy consumed will be deducted by the total energy produced from the QF (qualifying facility). The excess kWh will show as a monetary credit on the member's bill. Current rate: $0.03 / kWh

Rebates Offered
0
Deregulated
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Combination
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Offset Notes

Residential: 10 kW AC or recommended: 100% offset (whichever is less)

System can go over 10 kW AC on case by case basis

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-PM-Disco-POI
AC Disconnect Required
Yes
AC Disconnect Labeling
Utility Disconnect Switch
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

one-line diagram showing the QF, the interconnection equipment, breaker panel(s), disconnect switches and metering

Install Reqs

Utility shall furnish and install a standard kilowatt-hour meter. Customer shall provideand install a meter socket and any related interconnection equipment per Utility’s requirements.

Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
1
ESID Num Req SLD 3LD
0
Rate Schedule Link
link
Website
link
Phone
(575) 356-4491

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
147510
Express Planset Eligible
No
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with RCEC - Roosevelt County Electric Cooperative before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.