Alamo Power District No 3

Nevada Utility Interconnection & net metering rules
Net Metering Allowed0
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
0
TOU Utility
0
Post Solar Billing Method
Export Rate
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.04579
Solar Export Value Notes
Avoided cost changes monthly
Net Excess Generation Notes

The energy delivered from APD3 to the Customer in a regular monthly billing cycle, will be charged at APD3’s current rate schedule. Any energy the Customer generates that is received by APD3 in a regular monthly billing cycle will be credited to the Customer’s account at APD3 avoided cost of power. The Customer will receive a monetary credit for the energy received by APD3. If credit exceeds the delivered charge, the credit will be carried forward to the next month’s billing statement. At the end of each calendar year following the commencement of Interconnection Agreement by both Parties, APD3 will zero the Customer’s account of any excess credits. There will be no credit or buyback for the excess energy generated by the Customer. 

Rebates Offered
0
Deregulated
1
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Combination
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect

Plans & docs

Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Rate Schedule Link
link
Website
link
Phone
(775) 725-3335

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
5995859
Express Planset Eligible
Yes