Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Caliente Public Utilities

Nevada Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

Solar NEM customers will receive a monetary credit for excess energy. Excess energy is defined as the difference between the energy consumed from the grid and the solar energy exported to the grid. As of 2020, the rate for the excess kWh is 75% of the total retail rate. Credits can be ONLY be applied to future energy consumption charges. 

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
No
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Up to 100% offset OR 25 kW AC

** As this is a small utility/city, if the project triggers a transformer upgrade the only option will be to either downsize/cancel OR install their own dedicated transformer (100% customer's responsibility)

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Website
link

Other details

Restrict Inspection
0
Revision Required
0
Mod Swap Requires Planset
1
Address ID
2652917
Express Planset Eligible
Yes