Report a correction Net Metering AllowedYes
NEM TypeMonthly
Line Taps AllowedNo
Load Taps AllowedNo
Net metering & export
- Net Metering Allowed
- Yes
- NEM Type
- Monthly
- TOU Utility
- No
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
Solar NEM customers will receive a monetary credit for excess energy. Excess energy is defined as the difference between the energy consumed from the grid and the solar energy exported to the grid. As of 2020, the rate for the excess kWh is 75% of the total retail rate. Credits can be ONLY be applied to future energy consumption charges.
- Rebates Offered
- No
- Deregulated
- No
Interconnection & taps
- Approval Req To Install
- No
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- No
System size & offset
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Up to 100% offset OR 25 kW AC
** As this is a small utility/city, if the project triggers a transformer upgrade the only option will be to either downsize/cancel OR install their own dedicated transformer (100% customer's responsibility)
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Website
- link
Other details
- Revision Required
- No
- Mod Swap Requires Planset
- Yes