City of Fallon Utility
Line Taps Allowed0
Load Taps Allowed0
Net metering & export
- Post Solar Billing Method
- Feed-in-Tariff
- Net Excess Generation Notes
Generation will be read separately, and a check issued for energy delivered during the billing period for 75% of kWh standard tariff rate for generation, plus $0.004/kWh for all applicable PECs (Portfolio Energy Credits) generated.
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Tap Criteria
Supply Side Tap is only allowed POI (north of Utility Meter)
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Net nameplate rating doesn't exceed more than 10kW AC per premise for residential and not more than 100kW AC for commercial.
Doesn't generate more kWh than used by the customer on the net annual basis.
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
Supply Side Tap is only allowed POI
- Website
- link
- Phone
- (775) 423-3040
Other details
- Restrict Inspection
- 0
- Address ID
- 225314
- Express Planset Eligible
- Yes