Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
For a billing period, if the Customer generates more power then they consume, a credit will be shown on the bill and the credit will be applied to the next billing period.
The consumer's generated electricity (kWH) shall only apply to the city's standard service rate energy charge. All other standard service rate charges will be based upon the energy delivered by the city to the customer.
If the consumer-generator's facility feeds more kWH of electricity back to the city's system than the city supplies to the consumer during the billing period, the consumer energy charge will be credited based upon the kWH difference. Credits shall only be applied to the next billing period and the city will not refund credits. Credits are paid based upon the energy charge shown in the rate schedule.
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Percentage
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- System Offset Notes
The utility does not allow customers to generate power that exceeds a customer's annual electricity needs.
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- AC Disconnect required
- SLD Reqs
- AC Disconnect required
- Website
- www.lebanonohio.gov
- Phone
- (513) 933-7200
Other details
- Address ID
- 1156282
- Express Planset Eligible
- Yes