Darke Rural Electric Coop
Net metering & export
- Net Metering Allowed
- 0
- NEM Type
- N/A
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Net Excess Generation Notes
The Consumer shall use the output of the Electric Generating Facility first to meet the requirements of Consumer’s electric consuming facilities located on the Premises. The Power Company shall use an instantaneous kWh net billing period to measure the Consumer’s net production. The net production output shall be measured by determining during each such period the production in kilowatt-hours (kWh) of the Electric Generating Facility in excess of the requirements of the Consumer’s electric consumer facilities.
Per billing period, Excess energy will be purchased by Buckeye Power, Inc at their purchase rate (determined by Buckeye Power, Inc.). In the event that at the end of the annual period ending May 31 of each year the aggregate dollar amount of the billing credits for such year exceeds the aggregate dollar amount of the Power Company’s charges to the Consumer for such year, the Power Company shall issue a check to the Consumer for such excess dollar amount.
- Rebates Offered
- 0
- Deregulated
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 25
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Combination
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
Plans & docs
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Phone
- (937) 548-4114
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 9287655
- Express Planset Eligible
- Yes