Firelands Electric Cooperative
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
The Member shall use the output of the qualifying facility first to meet the requirements of Member’s electric consuming facilities located on the Premises. Any output of the qualifying facility in excess of the requirements of Member’s electric consuming facilities shall be transferred to the Cooperative and credited against the Member’s bill for electric service hereunder. Member shall only be entitled to receive a billing credit for any such output of the qualifying facility in excess of the requirements of the Member’s facilities, and in no event shall the Member be entitled to receive any payment from the Cooperative for any such excess output of the qualifying facility. Meters are read monthly through their automated reading system
- Rebates Offered
- 0
- Deregulated
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 25
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Combination
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- No
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Utility Disconnect Switch
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Standard
- SLD Reqs
Standard
- Electric Service Reqs
IEEE 1547
IEEEE 1547.1
NEC
NESC
OSHA
- Install Reqs
AC Disconnect Required:
- The cooperatives require a disconnect device or approved disconnect switch to be installed on the LOAD side of the services main/primary breaker,
- It must be readily accessible to the utility 24/7
- Placards
AC Disconnect must be labeled DER disconnect switch
- Electrical Stamp Required
- 0
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
Other details
- Restrict Inspection
- 0
- Express Planset Eligible
- Yes