Ohio Edison (FirstEnergy Corp)

Ohio Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Supply Side Taps Allowed1
Line Taps Allowed1
Load Taps Allowed1
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Solar Export Type
N/A
Net Excess Generation Notes

Each kWh of energy received from the customer offsets the energy delivered to the customer on a one for one basis, up to the amount of energy delivered to the customer during a billing period. Excess energy received from the customer is credited to the customer's account at the applicable generation component of the customer's rate schedule.

Rebates Offered
0
Deregulated
1
Allows Standby
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Supply Side Taps Allowed
1
Line Taps Allowed
1
Load Taps Allowed
1
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
1

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Percentage
Offset Value
120
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Size Justification
Load Justification
Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Meter Spot Required
0
Meter Spot Process
  • The customer's existing socket is used. Ohio Edison will replace the existing meter with a bidirectional unit.
  • TDR Process: Call Customer Service
  • Who to
  • Applications/Documents Req: N/A
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs
  • Property layout, street access, North arrow (with proper orientation), and nearest cross streets in each direction. Indicate direction of nearest cross street if impractical to show on drawing.
  • Ground mounts must show clearances, setbacks, details of surrounding structures (especially how they cross utility's facilities), and route and length of electrical connections from installation to main premises.
  • Location of AC disconnect
  • Location of generation, inverter, storage and associated electrical equipment
  • Location of service transformer
SLD Reqs
  • Identify utility meter, inverter, generation source and storage (battery) equipment.
  • Indicate DC and AC ratings of any generation source.
  • Indicate AC rating of the inverter.
  • Identify make and model of the Utility AC Disconnect and note that it is lockable with a visible break.
  • Identify POI.
  • Line side taps are allowed but not in meter can.

No attachments by the customer or the customer’s agent are permitted to Company-owned meters, meter circuits, or ancillary meter devices. The following are considered unauthorized connections when not made, installed, or performed by a Company employee or an authorized representative of the Company:

  • Any adapter placed between the revenue meter and meter socket
  • Attachments or connections to the potential or current circuits of transformer rated revenue meters
  • Any connection inside the meter socket
Electric Service Reqs
  • No adapters or splices are allowed in the meter socket.
Install Reqs


Electrical Stamp Required
0
Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Rate Schedule Link
link
Website
link
Phone
(800) 633-4766

Other details

Restrict Inspection
0
Address ID
297971
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Ohio Edison (FirstEnergy Corp) before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.