Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Pioneer Rural Electric Coop

Ohio Utility Interconnection & net metering rules
Net Metering Allowed0
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
0
TOU Utility
0
Post Solar Billing Method
Export Rate
Solar Export Type
Avoided Cost
Solar Export Rate
0.07
Solar Export Rate Approx
0.077
Net Excess Generation Notes

Any system output that goes through the meter to the grid during the billing cycle will be credited on the bill at $ 0.077 cents per kilowatt-hour (based on 2022 - can change each year).

Rebates Offered
0
Deregulated
1
Allows Standby
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
1

System size & offset

System Size Restrictions
25
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes


Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs
  • AC Disconnect required - Outside and accessible 24/7
SLD Reqs
  • AC Disconnect required
Website
link
Phone
(800) 762-0997

Other details

Restrict Inspection
0
Address ID
1096200
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Pioneer Rural Electric Coop before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.