Village of Carey

Ohio Utility Interconnection & net metering rules
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Rebates Offered
0
Deregulated
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Utility Disconnect Switch

Plans & docs

Site Plan Reqs

For solar equipment, the photovoltaic power source and interconnecting inverter shall be clearly labeled in accordance with the standards listed in rule 4901:1-22-03 of the Administrative Code to identify the following:

(i) Nominal current.

(ii) Nominal voltage.

(iii) Maximum short-circuit current.

Placards

• The disconnect switch must be clearly labeled as a DER disconnect switch

Website
link
Phone
(419) 396-7681

Other details

Restrict Inspection
0
Revision Required
0
Mod Swap Requires Planset
1
Address ID
1505371
Express Planset Eligible
Yes