Net Metering AllowedNo
NEM TypeN/A
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
No
NEM Type
N/A
TOU Utility
No
Post Solar Billing Method
Export Rate
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.055247
Solar Export Value Notes
Changes monthly
Net Excess Generation Notes

The Customer shall be billed according to the published City solar rates. Solar rates shall include a minimum billing cycle charge for connection to the City distribution system at the first 10 kWh rate. The bill shall then default to (a) customer shall pay for metered consumption used from the Frederick Public Works Authority power system at the published solar power rates for each billing cycle. (b) City will give a credit for solar generation power received back into the Frederick Public Works Authority power system at the current wholesale rate for each billing cycle. (c) The customer will pay the difference between (a) and (b) and/or the minimum billing cycle charge.

Rebates Offered
No
Deregulated
No
Allows Standby
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
No

System size & offset

System Size Restrictions
5
System Size Restriction Type
AC kW
System Size Battery Included
No
System Size Includes Existing Systems
Yes
Offset Type
Combination
Offset Value
100
Offset Calculation Basis
Average
Offset Calculation Period
12
Industry Standard Watts Sqft
2
Inverter Oversize Restrictions
No
Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
No
ESID Num Req SLD 3LD
No
Rate Schedule Link
link
Website
link
Phone
(580) 335-5360

Other details

Revision Required
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with City of Frederick (OK) before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.