Net Metering AllowedYes
NEM TypeMonthly
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
Yes
NEM Type
Monthly
TOU Utility
No
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

The received kWh will be deducted from the delivered kWh, if the result is negative OR zero the customer will only pay the monthly charge + applicable tax. No credit will be given for excess generation supplied back to the Edmond Electric

distribution system from the Customer’s distributed generation system

Rebates Offered
No
Deregulated
Yes
Allows Standby
No

Interconnection & taps

Approval Req To Install
No
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
No

System size & offset

System Size Restrictions
10
System Size Restriction Type
AC kW
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

10 kW AC max for Residential projects

Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect

Plans & docs

Site Plan Reqs

(SYSTEM LAYOUT):

ï‚§ SHOW LOCATION OF DISCONNECTS AND INVERTERS

ï‚§ SHOW LOCATION OF ALL MODULES AND ALL BATTERIES

ï‚§ SHOW LOCATION AND CONNECTION OF ALL GROUNDING ELECTRODE CONDUCTORS

ï‚§ SHOW LOCATION OF THE EQUIPMENT WITHIN THE STRUCTURE


(SITE PLAN):

ï‚§ PROVIDE DIMENSIONS OF CLEARANCES AROUND ALL EQUIPMENT

ï‚§ PROVIDE DIMENSIONS BETWEEN EQUIPMENT AND STRUCTURES

ï‚§ PROVIDE DIMENSIONS FROM EQUIPMENT TO PROPERTY LINES

SLD Reqs

(SYSTEM DESIGN):

 MANUFACTURER’S CUT SHEETS

ï‚§ ELECTRICAL PLANS

ï‚§ CALCULATIONS USED TO DETERMINE WIRE SIZES, FUSE AND BREAKER TYPE AND SIZING:

INCLUDING TEMPERATURE DERATION FACTORS PER THE NEC TABLE 690.31©.

ï‚§ ROOF MOUNTED SYSTEMS SHOULD USE THE WORST-CASE SCENARIO FOR AMBIENT TEMPERATURE OF 56-60 DEGREES C.

SEE NEC TABLES 310.15 (B)(2)(A); (B)(3)(A) & (B)(3)(C).

Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
No
ESID Num Req SLD 3LD
No
Rate Schedule Link
link
Website
link
Phone
(405) 359-4780

Other details

Revision Required
Yes
Mod Swap Requires Planset
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Edmond Electric (City of Edmond) before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.