Central Electric Cooperative, Inc. (OR)

Oregon Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
NEM TypeMonthly
Supply Side Taps AllowedNo
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
Yes
NEM Type
Monthly
TOU Utility
No
Post Solar Billing Method
Net Metering
Solar Export Type
N/A
Net Excess Generation Notes

Net energy is the difference between the electricity supplied by Central Electric Cooperative, Inc. and the electricity generated by an eligible Customer-generator and fed back to Central Electric Cooperative, Inc.’s electrical system over the applicable billing period. Excess power generated shall be credited to the Customer-generator’s account at Central Electric Cooperative, Inc.’s prevailing “avoided cost.” This credit shall be used to offset future billings for electrical power consumed. All net-metering accounts shall be cleared (i.e., returned to a $0.00 balance) annually. For each twelve (12) month period ending in December, any remaining credit in the Customers-generator’s account shall be returned to the respective Customer-generators.

Rebates Offered
No
Deregulated
No

Interconnection & taps

Approval Req To Install
Yes
Supply Side Taps Allowed
No
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
No

System size & offset

System Size Restrictions
25
System Size Restriction Type
DC kW
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes


Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Utility Disconnect
Meter Spot Required
Yes
Allowed Meter Adapter
Tesla Backup Switch

Plans & docs

SLD Reqs
  • Show switchgear, transformers, and generation equipment.
  • Include a brief description of how the generation operates, e.g.: Cogeneration, Closed-transition peak shaving, Open-transition peak shaving, Emergency power
Install Reqs

Customer-Generator Disconnect Requirements

  • Must be visible break type in a metal enclosure that can be padlocked.
  • Manual pull lever at the electric meter is required.
  • Placards indicating disconnect location are not accepted.
Placards
  • The visible disconnect shall be clearly labeled “Generation Disconnect” to inform CEC's line and substation personnel.
Electrical Stamp Required
No
Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
No
ESID Num Req SLD 3LD
No
Website
link
Phone
(541) 548-2144

Other details

Revision Required
Yes
Mod Swap Requires Planset
Yes