Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

City of Ashland (OR)

Oregon Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

Net electricity generated will be carried forward each billing cycle where a surplus exists. Accumulated net electricity will be converted from a kilowatt to dollar amount credit each based on the Municipal Utility’s wholesale rate on the next available billing cycle after March 31 of each year.

Rebates Offered
1
Deregulated
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
1

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

In order for the customer to be eligible for the rebate, the customer must have 2kW of qualifying panels with a 75% minimum TSRF (total solar resource fractions)

  • For single inverter systems, identify the location on the plans with the lowest TSRF.
  • For micro inverter systems, identify each panel location on the plan and provide corresponding TSRFs
  • For micro inverters serving multiple panels, identify each panel location on the plans and provide corresponding PSRF's, and identify each group of panels served by each micro inverter.
SLD Reqs

Standard

Electric Service Reqs

AC Disconnect Required

Electrical Stamp Required
0
Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Website
link

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
4226330
Express Planset Eligible
Yes