City of Forest Grove Light & Power
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
If the Net Metering Facility feeds back into FGL&P’s system more electricity than is used by the Customer-generator’s owner during a billing period, the Customer-generator will be billed the customer charge applicable to their class of service and be credited for the excess electricity generated and fed to FGL&P’s system. The utility will apply the excess kilowatt-hours as a cumulative credit to the customer-generator’s next monthly bill. For the billing period ending in March of each year, any unused credits that have accumulated during the previous twelve months will be applied to FGL&P’s low- income assistance program. Annual billing cycle will end every March regardless of having less than 12 months of solar production.
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 1
System size & offset
- System Size Restrictions
- 25
- System Size Restriction Type
- DC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Combination
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- System Offset Notes
100% offset (historical 12 months production OR average of the last 3 years). Maximum: 25 kW
- Offset Calc Tool
- PV Watts
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Equipment Approvals
- California Energy Commission
- Website
- link
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Address ID
- 1042538
- Express Planset Eligible
- Yes