Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

City of Monmouth Power and Light

Oregon Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
Post Solar Billing Method
Net Metering
Solar Export Type
Avoided Cost
Net Excess Generation Notes

If the value of the electricity generated by the Customer exceeds the price of Customer's consumption at the standard rate and is distributed back to the CITY during the billing period, then the Customer shall be billed for the same customer service charge as are applied to other customers of the CITY in the same rate class and paid for the value of the electricity generated at the CITY's avoided cost.

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
1

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Nameplate generating capacity of not more than twenty-five (25) kilowatts per meter

Offset Calc Tool
PV Watts

Metering & disconnect

Production Meter Required
Situational
Production Meter Criteria
  • A production meter is not strictly required, but the Net Metering Agreement allows the City of Monmouth to install one at its discretion.
  • Do not add one unless specifically requested by the utility .
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Utility AC Disconnect
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

AC Disconnect must be within 10 ft of, and within sight of Utility Meter.

Install Reqs

Customer shall furnish and install a switch capable of fully disconnecting and isolating the Customer's system from the Utility's.

Placards

Provide permanent, durable signage as specified in the City's applicable interconnection standards.

Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Website
link
Phone
(503) 838-0722

Other details

Restrict Inspection
0
Address ID
284079
Express Planset Eligible
No
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with City of Monmouth Power and Light before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.