EPUD - Emerald People’s Utility District

Oregon Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Supply Side Taps Allowed1
Line Taps Allowed1
Load Taps Allowed1
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

• If a Net Metering Facility uses more electricity than is fed back into the District’s system during a billing period, the Customer-generator will be billed for the net energy consumed based on the rate applicable to their class of service.

• If the Net Metering Facility feeds back into the District’s system more electricity than is used by the Customer-generator’s owner during a billing period, the Customer-generator will be billed the facilities charge applicable to their class of service and be credited for the excess electricity generated and fed to the District’s system.

• For the billing period ending in March of each year, any unused credits that have accumulated during the previous twelve months will be applied to the District’s low income assistance program. The monetary rate of credit for these purposes will be based on the District’s avoided cost.

Rebates Offered
1
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Supply Side Taps Allowed
1
Line Taps Allowed
1
Load Taps Allowed
1
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
1

System size & offset

System Size Restrictions
25
System Size Restriction Type
DC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Combination
Offset Value
100
Offset Calculation Basis
Average
Offset Calculation Period
36
Industry Standard Watts Sqft
2
System Offset Notes


Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs
  • Must show existing obstructions
  • Locations of pre-existing photovoltaic components (if applicable)
  • Locations of submitted TSRF measurement(s)
  • AC disconnect be visible from the utility meter and accessible at all times.
SLD Reqs
  • Module series/parallel wiring
  • Wire run from array to point of Emerald interconnection, including applicable panels, with preexisting wiring or sub-panels used in the AC run clearly labeled
  • Conductor and ground wire types and sizing
  • Conduit types and sizing
  • Voltage drop calculations
  • AC and DC breaker sizing
Install Reqs


Placards
  • Use permanent, UV-resistant labels with engraved, stamped, or printed text (no handwriting).
  • Place the inverter disconnect label on or near the disconnect box, not on the inverter.
  • Add a System-Utility Interconnection label at the base of the utility meter that reads: “Interactive Solar Photovoltaic Power Connected.”
  • Include on the same label: Rated AC Output Current (___ Amps) and Nominal Operating AC Voltage (___ Volts).
Electrical Stamp Required
0
Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Website
link
Phone
(541) 746-1583

Other details

Restrict Inspection
0
Address ID
620832
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with EPUD - Emerald People’s Utility District before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.