Net Metering AllowedYes
NEM TypeMonthly
Supply Side Taps AllowedYes
Line Taps AllowedYes
Load Taps AllowedYes

Net metering & export

Net Metering Allowed
Yes
NEM Type
Monthly
Post Solar Billing Method
Net Metering
Solar Export Type
Fixed kWh
Solar Export Rate
0.036
Net Excess Generation Notes

At the end of each monthly meter reading cycle, excess energy generated by the CG System as measured by EWEB’s billing meter shall be credited at the

excess generation rate All kWh of excess generation.


With net metering, the utility meter records the net amount of energy generated through the PV system. When you're creating more electricity than you're using, the electric meter will spin backwards and the excess electricity is sent to the electric grid. This helps to offset the cost of your electricity usage at night or on cloudy days when your system is not producing.


With direct generation, all of the energy generated through your PV system goes directly to our electric grid and we purchase all of the energy from you.


The generation will be calculated at the current annual rate schedule (2021 Renewable Net-Metered Rate is $0.0360 per kWh; 2021 Annual Renewable Generation Rate is $0.0369 per kWh).


For net-meter ONLY, any renewable energy credits or certificates (RECs) generated from the Project may be retained by Customer. For direct generation ONLY, EWEB shall retain all right, title, and interest in the

renewable energy credits or certificates (RECs) generated from the Project. For direct generation ONLY, Customer shall complete and sign a Renewable Attribute Attestation associated with the RECs from the Project

Rebates Offered
No
Allows Standby
No

Interconnection & taps

Approval Req To Install
Yes
Supply Side Taps Allowed
Yes
Line Taps Allowed
Yes
Load Taps Allowed
Yes
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
25
System Size Restriction Type
AC kW
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Size Justification
Load Justification
System Offset Notes
  • Maximum net meter system size is 25 kW AC output
  • Project must meet a minimum Total Solar Resource Factor (TSRF) of 85 percent.

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs
  • Project must meet a minimum Total Solar Resource Factor (TSRF) of 85 percent.
Equipment Approvals
California Energy Commission
Website
link