SUB - Springfield Utility Board
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.03493
- Net Excess Generation Notes
Any excess energy generated by the customer and supplied to SUB's system shall be valued based upon the Avoided Cost Rate. If during a billing cycle a customer has provided excess energy, the customer shall be billed for appropriate monthly charges, as determined by SUB, and shall receive a credit on their billing statement for such excess energy at the applicable Avoided Cost Rate.
Before 6/14/2023: 1:1
6/14/2023: 3.493 cents per kWh
Once enrolled in the Net Metering Program, the customer cannot join other programs (Low Income, Average Pay, etc.). If they are enrolled in another program, they’ll have to leave that program before they can apply for the Net Metering Program.
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 200
- System Size Restriction Type
- DC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Up to 200 kW
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- Major electrical component locations must be shown and labeled. Major electrical components include panels, inverters, disconnects, batteries, etc.
- The AC disconnect must be accessible to the utility 24/7
- The AC disconnect must be visible from the utility meter
- SLD Reqs
- Must show including metering points in relation to SUB's electrical system and the customer's generating system location
- Install Reqs
- The system complies with all the latest applicable National Electric Code (NEC) requirements, building codes
- Provide space for metering equipment and meter base as per SUB requirements. The system must have a manual disconnect switch that is clearly visible from the meter and SUB shall have access to the manual disconnect switch. The manual disconnect switch shall provide a visible open-connection between customers generation and SUB’s source. The manual disconnect switch shall be lockable only in the open position.
- The customer’s over-current device at the service panel shall be marked to indicate power source and connection to SUB’s distribution system.
- Equipment Approvals
- California Energy Commission
- Website
- link
- Phone
- (541) 746-8451
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 0
- Address ID
- 341342
- Express Planset Eligible
- Yes