Adams Electric Cooperative (PA)

Pennsylvania Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
1
Post Solar Billing Method
Net Metering
Solar Export Type
Avoided Cost
Net Excess Generation Notes

The AES/QF Owner is responsible for executing a contract with Allegheny to receive compensation for its output delivered into the Cooperative's electric system. At the end of each annual period, Allegheny shall compensate the AES/QF for kilowatt-hours generated by the AES/QF over the amount of kilowatt-hours billed by the Cooperative during the annual period at Allegheny’s avoided cost of wholesale power. The Cooperative may allow excess energy generated by an AES/QF to offset energy purchases at another location of the same member as long as the location is within two miles of the interconnection of the AES/QF. 

Rebates Offered
1
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
1

System size & offset

System Size Restrictions
25
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Combination
Offset Value
110
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Offset Notes
  • The system cannot generate no more than 110% of the member's annual electric energy consumption as determined during the 12 months immediately preceding the year of interconnection and may not have a nameplate capacity greater than 25kW for residential accounts.
Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs
  • A lockable, manually operable, visible load-break disconnecting device is required for all AES/QF interconnections
  • The device will be installed at an accessible location and must be labeled as required by the Cooperative to inform Cooperative personnel of the presence of generation
SLD Reqs
  • A lockable, manually operable, visible load-break disconnecting device is required for all AES/QF interconnections
  • The device will be installed at an accessible location and must be labeled as required by the Cooperative to inform Cooperative personnel of the presence of generation
Install Reqs
  • Facilities shall be installed to current NFPA 70-2014 codes or latest edition or applicable electrical / building codes
  • The Member shall not operate its project on an interconnected basis until the Member has received specific written permission from an authorized Cooperative employee and in such form as attached as Schedule C to the IPPA. Before such written permission, the Member may energize its project only for the sole purpose of witness testing. There are no exceptions to these energization and operation requirements.
Electrical Stamp Required
1
Website
link
Phone
(800) 726-2324

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
190139
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Adams Electric Cooperative (PA) before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.