Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

DLC - Duquesne Light Company

Pennsylvania Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Supply Side Taps Allowed1
Line Taps Allowed1
Load Taps Allowed1

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

"Any excess kilowatt hours shall continue to accumulate for the 12 month period ending May 31. On an annual basis, the Company will

compensate the customer-generator for kilowatt-hours received from the customer-generator in excess of the kilowatt hours delivered by the Company to the customer-generator during the preceding year at the Company’s Price To Compare consistent with Commission regulations."

Rebates Offered
1
Deregulated
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Supply Side Taps Allowed
1
Line Taps Allowed
1
Load Taps Allowed
1
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
1

System size & offset

System Size Restrictions
50
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

50kW for residential and 3MW for commercial

Cannot exceed 110% on TPO

Based on AC

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

Fencing/Obstructions must be called out

We require Utility Accessible Disconnects to adhere to the following: outside of any residential structure, easily accessed in the event of an emergency without customer contact (i.e., not behind a locked fence)

SLD Reqs

INV - AC Disconnect - MSP - UM


Please list disconnect on diagram as “utility accessible AC disconnect”


DLC allows supply-side taps, but they must be BEHIND the utility meter via a tap box or similar equipment, or the supply side of the customer’s panel

Electric Service Reqs

"(Voltage Magnitude and Flucuation - PG 17, Section 1) Pennsylvania PUC Electric Regulations require that voltage variations not exceed ±5% of nominal system voltage for longer than one minute and a total voltage variation of ±8% from minimum to maximum during normal system operation


(Grounding Electrode Conductors - PG 20, Section B) The grounding electrode conductor size shall be not less than No. 6 copper or aluminum. Larger services shall have grounding electrode conductors sized as specified in Article 250- 94 of the National Electrical Code (NEC). NEC Article 250-23 shall determine where the grounding electrode conductor is connected to the grounded service conductor. The meter enclosure (base) shall not be used for this connection because it is not accessible when sealed.


(PG 21, Section 8) Transformer Configuration: Transmission generator step-up transformers"

Install Reqs

Duquesne Light will install a net meter at no cost to the customer. A net meter is typically installed within 7-10 business days.

A customer-generator facility used for net metering shall be equipped with a single bi-directional meter that can measure and record the flow of electricity in both directions at the same rate. A dual meter arrangement may be substituted for a single bi-directional meter at the Company’s expense.

Placards

Placard required when Utility Disconnect is not next to Utility Meter

Need to show location of Utility Accessible Disconnect

Rate Schedule Link
link
Website
link
Phone
(412) 393-7100

Other details

Restrict Inspection
0
Address ID
189213
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with DLC - Duquesne Light Company before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.