REA Energy

Pennsylvania Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
NEM TypeAnnual
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
Yes
NEM Type
Annual
TOU Utility
No
Post Solar Billing Method
Net Metering
Rebates Offered
No
Deregulated
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
Yes

System size & offset

System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Theoretically it can be sized up 500kw. However, if the size of the system exceeds the transformer size, the member is responsible for the cost of transformer upgrade.

Example: if you want to install a 25 kw system and the transformer is rated for 15KVA, the member would be responsible to pay for an upgrade to a 25KVA transformer.

Metering & disconnect

Allowed Meter Adapter
None

Plans & docs

SLD Reqs

Panels, inverter, safety disconnect switch, solar production meter, utility meter, distribution panel, wire and conduit, batteries and transfer switch (if applicable)

The AES/QF must be installed a minimum of 100 feet or total height of AES/QF plus 40 feet, whichever is greater, away from the nearest overhead electric facility, or such other distance that REA deems necessary for safety related reasons.

Install Reqs

A new solar production meter socket will need to be inspected and we must receive the inspection card.

Any standard 4 prong meter socket that will pass local inspection.

REA will install the meter.

Website
link
Phone
(724) 349-4800
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with REA Energy before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.