Pascoag Utility District
Net Metering Allowed0
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 0
- TOU Utility
- 0
- Post Solar Billing Method
- Feed-in-Tariff
- Solar Export Type
- Other
- Solar Export Value Notes
- Power Supply rate (.068549)
- Net Excess Generation Notes
The Net Excess Generation Policy is only intended for residential properties that are owner occupied and single family, not to exceed a three family home.
The customer will receive an electric bill each month for the home's electric usage. The utility will take the kilowatt hours that the solar system produced and multiply it by their Power Supply rate (.068549) and apply a credit to the customer's bill. If the credit is maintained for two or more annual reconciliations, the customer can request the credit to be issued in the form of a check from the utility. The Power Supply rate is subject to change annually.
- Rebates Offered
- 0
- Deregulated
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Tap Criteria
- Meters shall be connected to the "line side" of the PUD
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- AC disconnect is required to be installed within 10 feet of the production meter. Exterior locations only.
- AC disconnect must be accessible to the utility 24/7
- SLD Reqs
- Requires a production meter
- The production meter should not run through the utility meter and must be separate
- Battery Projects: Require a whole home disconnect with the intention of the battery supplying power to the home in the case of a power outage
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
- Phone
- (401) 568-6222
Other details
- Restrict Inspection
- 0
- Revision Required
- 0
- Mod Swap Requires Planset
- 1
- Address ID
- 1619327
- Express Planset Eligible
- Yes