BREC - Black River Electric Cooperative
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
For purposes of calculating monthly energy in kilowatt-hours, member’s usage shall be reduced by the total of (a) any excess energy delivered to the Cooperative in the current month plus (b) any accumulated excess energy balance remaining from prior months. Total energy in kilowatt-hours billed to members shall never be less than zero. For any billing month during which excess energy exceeds the member’s usage in total, producing a net credit, the respective energy charges for the month shall be zero. Credits shall not offset the facilities charge for the applicable rate schedule.
- Rebates Offered
- 0
- Deregulated
- 1
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 20
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Combination
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- Inverter Oversize Restrictions
- 0
- System Offset Notes
The rated capacity of the member’s generating system shall not exceed the lesser of
(a) the member’s estimated maximum kilowatt demand or
(b) 20 kilowatts for a residential system or 100 kilowatts for a nonresidential system.
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
a one-line diagram showing the electrical design of the generating installation, depicting the necessary equipment for interconnection with the Cooperative's system.
- Install Reqs
Contact the cooperative directly to schedule a TDR, no fees specified from Rep
"A manual load-break disconnect switch or safety switch with a clear visible indication of switch position between the CES and the Distributed Resource. The switch must have pad lock provisions for locking in the open position. The switch must be visible to, and accessible to Cooperative personnel. The switch must be in close proximity, and visible from, the Member’s point of common coupling with the CES. The switch must be labeled “Generator
Disconnect Switch”. The switch may isolate the Distributed Resource system and its associated load from the CES or disconnect only the Distributed Resource from the CES."
- Placards
"Member will install a permanent warning label in a conspicuous place in close proximity to the electric meter or on the meter base to notify them personnel that there is a generator installed on the load side of the meter. The warning label shall not be placed in a
location that would interfere with the ability of Cooperative personnel to read the electric meter. Member shall also place a warning label on the Isolation Device. Cooperative will provide the warning labels to Member. The warning labels must be in place before the Distributed Resource can be interconnected with Cooperative’s system."
- Equipment Approvals
- California Energy Commission
- Rate Schedule Link
- link
- Website
- link
- Phone
- (803) 469-8060
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 164668
- Express Planset Eligible
- Yes