Broad River Electric Cooperative
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- Fixed kWh
- Solar Export Rate
- 0.04209
- Net Excess Generation Notes
For each billing period, the member’s monthly energy consumption and generation will be metered. The kWh Delivered to the member will be metered separately from the kWh Received to the grid from the member. Net kWh will be used to determine energy charges for the billing period. Any Excess Energy Credit shall be valued at $0.04209/kWh for the energy produced by the system that is not consumed in the home each month.
- Rebates Offered
- 0
- Deregulated
- 1
- Allows Standby
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 1
- Line Taps Allowed
- 1
- Load Taps Allowed
- 1
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 20
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- PV Watts
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Meter Spot Process
Contact Utility for the disconnect.
- Allowed Meter Adapter
- None
Plans & docs
- Install Reqs
The Customer installs the Generator and the Customer is responsible for obtaining an approved electrical inspection from the local authority having jurisdiction for the Generator installation. The Customer shall request the inspector to forward a copy of the approved inspection to the Company contact processing the Generator interconnect request. A manual load break disconnect switch with a clear visible indication of switch positionand provisions to have a pad lock installed in the open position must be installed where visible and accessible to the Company's personnell and close to and visible from the point of interconnection. The switch must be labelled, "Generator Disconnect Switch"
- Placards
" Customer will install a permanent warning label in a conspicuous place in close proximity to the electric meter or on the meter base to notify Company personnel that there is a
generator installed on the load side of the meter. The warning label shall not be placed in a location that would interfere with the ability of Company personnel to read the electric meter.
Customer shall also place a warning label on the Isolation Device. Company will provide the warning labels to Customer. The warning labels must be in place before the Generator can be interconnected with Company’s system"
- Equipment Approvals
- California Energy Commission
- Website
- link
- Phone
- (866) 687-2667
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 164958
- Express Planset Eligible
- Yes