Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

City of Clinton DPW

South Carolina Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

Excess energy credits produced shall accumulate and be used to offset Customer’s energy consumption bill for a period of not more than twelve (12) months. At the end of each calendar year, unused excess credits shall be paid by Utility to the Customer. Excess Generation shall be credited to the customer at the energy rate calculated in accordance of the Schedule A. Currently:

On-Peak Energy 2.168 ¢/kWh

Off-Peak Energy 3.874 ¢/kWh

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
20
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Systems shall not exceed 20kW for residential customers and shall not exceed 100kW for non-residential customers.

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

a one-line diagram showing the electrical design of the generating installation, depicting the necessary equipment for interconnection with the Cooperative's system.

Install Reqs

Utility Inspection Required: Yes

Customer shall install a manual disconnect switch of the visible load break type to provide a separation point between the AC power output of the CRG system and any Customer wiring connected to Utility’s electric system such that back feed from the CRG system to Utility’s electric system cannot occur when the switch is in the open position. The manual disconnect switch shall be mounted separate from the meter socket on an exterior surface

adjacent to the meter. The switch shall be readily accessible to Utility and capable of being locked in the open position with a Utility padlock. When locked and tagged in the open position by Utility, this switch will be under the control of Utility

Equipment Approvals
California Energy Commission
Website
link
Phone
(864) 200-4551

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
156249
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with City of Clinton DPW before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.