Edisto Electric Cooperative, Inc
Net Metering Allowed0
NEM TypeAnnual
Line Taps Allowed1
Load Taps Allowed0
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 0
- NEM Type
- Annual
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Other
- Solar Export Value Notes
- $0.0328/kWh
- Net Excess Generation Notes
Edisto’s Value of Solar is $0.0328/kWh. Members will receive a credit on their bill each month for excess energy that is “reversed” through the revenue meter.
Reversed is defined as energy flowing from the consumer through the meter to the cooperative
- Rebates Offered
- 0
- Deregulated
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 1
- Load Taps Allowed
- 0
- Tap Criteria
- The cooperative will not approve any lineside taps. Should such a configuration be encountered, the solar-system application would not be approved, nor would the interconnection process be completed.
- Line-side taps are allowed, but they shall not be installed in the meter base. The utility would prefer that we connect the PV system behind a breaker in the member’s breaker panel when possible.
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 20
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Combination
- Offset Value
- 95
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- System Offset Notes
- Restricted to no more than a 95% energy offset in a twelve-month period
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- AC Disconnect Required
- Yes
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- AC disconnect is required to be accessible to the utility 24/7 (External locations only)
- Install Reqs
- Any plan to install solar equipment upon a power-line right-of-way easement assigned to the cooperative would be prohibited. Neither project approval nor the interconnection process would go forward until the proposed site of the equipment could be relocated. The relocation site would need to be situated on ground that rests totally beyond the boundaries of any said right-of-way strip.
- Placards
- The only label that is specifically referenced in Edisto’s Interconnection Agreement is the Emergency Disconnect Switch. The EDS must be labeled accordingly. Most solar companies place stickers or markers on the meter base.
- Website
- link
- Phone
- (800) 433-3292
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 164978
- Express Planset Eligible
- Yes