Net Metering AllowedYes
NEM TypeAnnual
Line Taps AllowedYes
Load Taps AllowedNo
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
Yes
NEM Type
Annual
TOU Utility
Yes
Post Solar Billing Method
Net Metering
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.04
Solar Export Value Notes
"""On Peak Energy 3.874 cents Off-Peak Energy 2.168 cents"""
Net Excess Generation Notes

Customer-owned renewable generation shall be first used for Customer’s own load and shall offset Customer’s demand for electricity from the Utility. All electric power and energy delivered by Utility to Customer shall be received and paid for by Customer pursuant to the terms, conditions and rates of the Utility’s applicable rate schedules.

Excess customer-owned renewable generation shall be delivered to the Utility’s electric distribution system. For purposes of this Agreement, the term “excess customer-owned renewable generation” means any kilowatt-hours of electrical energy produced by the customer-owned renewable generation system that is not consumed by Customer and is delivered to Utility’s electric distribution system. PMPA agrees to purchase and receive, and Customer agrees to sell and deliver, all excess customer-owned renewable generation at the energy rate established by PMPA, which shall be calculated in accordance with Schedule A. Excess customer-owned renewable generation shall be billed in the form of a credit on Customer’s monthly electricity consumption bill from Utility. 

In the event that a given monthly credit for excess customer-owned renewable generation exceeds the total billed amount for Customer’s consumption in any corresponding month, then the excess credit shall be applied to the subsequent month’s bill. Excess energy credits so produced shall accumulate and be used to offset Customer’s energy consumption bill for a period of not more than twelve (12) months. At the end of each calendar year, unused excess credits shall be paid by Utility to the Customer. 

Rebates Offered
No
Deregulated
No
Allows Standby
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
Yes
Load Taps Allowed
No
Tap Criteria
  • Gaffney BPW prefers line taps to be made in the customer panel if possible
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
20
System Size Restriction Type
AC kW
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
Yes
Production Meter Criteria
  • Bpw requires an additional 100 amp meter base to be installed by to be used as a production meter. Gaffney BPW supplies the meter itself.
  • The AC disconnect should be installed between the two electrical meters ( utility meter base & production meter base)
Production Meter Position
Inv-PM-Disco-POI
Production Meter Labeling
Production Meter
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs
  • The manual disconnect switch shall be mounted separate from the meter socket on an exterior surface adjacent to the meter. 
SLD Reqs

Meter Orientation = Over/Under

  • Bpw requires an additional 100-amp meter base to be installed by contractor to be used as a production meter. (Gaffney BPW supplies the meter itself.)
  • PV meter base. The source/line side of meter base is to be wired toward the solar panel inverters. The load side wires are to go toward the utility.
  • The ac disconnect should be installed between the two electrical meters (utility meter base & production meter base)
Meter Num Req SLD 3LD
No
ESID Num Req SLD 3LD
No
Website
link
Phone
(864) 488-8800

Other details

Revision Required
No
Mod Swap Requires Planset
Yes